News
Commissioning of 3xSLE12-16 for COSCO/BOURBON
Published on 12/13/2017
Within 5 days SLCE has successfully commissioned three SLE12-16 supplied to COSCO SHIPYARD for the future BOURBON accommodation barge. Each unit produces 200tpd of freshwater.
One of the unit has a built-in 2nd pass producing technical water.
Equipment benefit from an energy recovery system limiting energy consumption below 3kWh/m3 of freshwater produced.
My watermaker
Consult the documentation
Thank you for selecting a capacity for complete specifications.
Consult the documentation
Thank you for selecting a capacity for complete specifications.
Consult the documentation
Thank you for selecting a capacity for complete specifications.