News

Project for a mine of copper in Chile

SLCE watermakers, through it representative in Chile ARSEPUR, received an order from BECHTEL, the engineering company in charge of Quebrada Blanca II project for TECK.

SLCE watermakers will deliver, early 2019, two 40-footer producing each 1 160tpd of freshwater. A third one will be delivered late 2019.

The designed is based on the very heavy-duty range GBW60.

The installation will operate at around 4000 m above mean sea level in harsh environment.

My watermaker

Consult the documentation Thank you for selecting a capacity for complete specifications.
Consult the documentation Thank you for selecting a capacity for complete specifications.
Consult the documentation Thank you for selecting a capacity for complete specifications.