News

Commissioning of 3xSLE12-16 for COSCO/BOURBON

Within 5 days SLCE has successfully commissioned three SLE12-16 supplied to COSCO SHIPYARD for the future BOURBON accommodation barge. Each unit produces 200tpd of freshwater.

One of the unit has a built-in 2nd pass producing technical water.

Equipment benefit from an energy recovery system limiting energy consumption below 3kWh/m3 of freshwater produced.

20171113_155407

My watermaker

Consult the documentation Thank you for selecting a capacity for complete specifications.
Consult the documentation Thank you for selecting a capacity for complete specifications.
Consult the documentation Thank you for selecting a capacity for complete specifications.