Within 5 days SLCE has successfully commissioned three SLE12-16 supplied to COSCO SHIPYARD for the future BOURBON accommodation barge. Each unit produces 200tpd of freshwater.
One of the unit has a built-in 2nd pass producing technical water.
Equipment benefit from an energy recovery system limiting energy consumption below 3kWh/m3 of freshwater produced.