News

The secret behind a successful commissioning

Published on 06/21/2019

The result of having every single unit full checked, in operation with seawater, before shipment from our premises, is a hassle-free commissioning.

Once again, it has been the case with the acceptance of the 3 x SLE15-15.5 installed on the new SAGA cruise ship “Spirit of Discovery” built by MEYERWERFT during the first sea trials.

My watermaker

Consult the documentation
Consult the documentation
Consult the documentation
vel, consequat. leo ut quis, luctus Donec ut libero. leo. at